Ragmet Engineers offers specialised Heat Exchanger & Tubing Services and is committed to delivering cutting-edge solutions tailored to meet your specific needs. Our team of skilled professionals combines expertise with advanced technology to ensure optimal performance, efficiency, and longevity of your heat exchangers and tubing systems.
| Sr. No. | Work Order No. | Client | Nature of Job |
|---|---|---|---|
| 1 | TH/MES / W-18620047 | M/s. RCF - Thal | Retubing of heat exchanger |
| 2 | 4000128 - OS - 48002 dated 23.04.2004 | M/s. HPCL | Repairing of Exchanger comp one |
| 3 | MES/204/L/0405/262 dated 22.09.2004 | M/s. RCF | Testing and Repair of BFW Heater and Tail Gas Cooler in ONAP |
| 4 | MES/228/L/0405/349A dated 25.11.2004 | M/s. RCF | Hydro testing of HE-2A, HE-2B,HE-1 & HE-10 exchanges in SNNP |
| 5 | MES/204/L/0405/408 dated 17.01.2005 | M/s. RCF | Dismantling of the Mechanical items of Cooling Tower of ONAP |
| 6 | 5300026738 Dt. 19.01.2005 | M/s TATA | Cleaning and Tube leak check of unit #4 condenser at Trombay Generating Station |
| 7 | 5300027039 Dt. 02.02.2005 | M/s TATA | Trombay 500 MW #6 Outage Jan/Feb 05: Overhaul of Equipment in CW and condensate system |
| 8 | 4501220182 Dt. 07.04.2005 | M/s. BPCL | FO2 Tube Sheet Replacement in CDU Shutdown |
| 9 | MES/209/L/0405/567 dated 08.04.2005 | M/s. RCF | Reformer Tube sand outlet header replacement in Methanol plant |
| 10 | 5300028764 Dt. 09.04.2005 | M/s TATA | Cleaning and Tube leak check of unit #4 condenser at Trombay Generating Station |
| 11 | MES/234/L/0102/365 | RCF | Replacement of ED-4 in NNAP |
| 12 | P.O. 01- 01441 | HPCL | Hydro testing & Repair of CC-3 IBR Circuit Exchanger at H2-II LR |
| 13 | TH/MES/W-22660199 | RCF-TH | Replacement of E 504 in Ammonia Plant |
| 14 | TH/MES/KGP/02/DI-145 | RCF-TH | REPLACEMENT OF E-1510 B IN AMMONIA PLANT |
| 15 | 02-04822 27/05/2002 | M/S. HPCL | TIG WELDING OF GAS TURBINE COMPONENTS |
| 16 | BRBC/OBG/PCM/C.O EXCHANGER/94-95 | ONGC | |
| 17 | MES/205/L/0910/402 | RCF | Interchanging of acid & water connections of IAT tower plate heat exchanger in SAP |
| 18 | 5300014580 | TATA | Cleaning and Tube leak check of unit #4 condenser at Trombay Generating Station |
| 19 | 5300014252 | TATA | Cleaning and Tube leak check of unit #4 condenser at Trombay Generating Station |
| 20 | 5300009199 | M/s TATA | Trombay 500 MW #6 Outage Jan/Feb 05: Overhaul of Equipment in CW and condensate system |
| 21 | 5300007619 | TATA | Overhaul of Turbine valves & auxiliaries |
| 22 | 5300007712 | TATA | Replacement of 4 way butterfly valve of condenser |
| 23 | 5300007133 | TATA | Cleaning and Tube leak check of unit #4 condenser at Trombay Generating Station |
| 24 | MES/241/L/0910/269 07/10/2009 | RCF | REPAIRING & LEAK TESTING OF EXCHANGERS(E-111,112,113,113A) IN METHYLAMINE PLANT |
| 25 | MES/241/L/0809/078 26/05/08 | RCF | REPLACEMENT OF OLD EXISTING OVERHEAD CONDENSER TUBE BUNDLES FOR DEHYDRATOR E-134 & COLUMNS E-119 IN METHYLAMINE PLANT |
| 26 | MES/234/L/0809/234 06/09/08 | RCF | PNEUMATIC TESTING AND TUBE PLUGGUNG OF E03 IN MPNAP |
| 27 | MES/241/L/0708/272 15/11/07 | RCF | REPAIRING & HYDROTRESTING OF SOLUTION COOLERS9E-151,151A,161,171) IN METHYLAMINE PLANT |
| 28 | 7000073-OS-48002 19/04/07 | HPCL | RETUBING OF CS TUBES |
| 29 | MES/205/L/0607/506 01/03/07 | RCF | TUBE LEAKAGE IN IHE & FHE IN SAP |
| 30 | OS-5001537 14/11/06 | HPCL | SEAL WELDING OF 70-30 Cu-Ni Tube |
| 31 | 5001537-OS-48002 24/01/06 | HPCL | Standing order for Seal Welding of 70-30 Cu-Ni Tu |
| 32 | MES/203/L/0506/343 10/12/05 | RCF | Replacement of Primary Reformer tubes in Ammonia I Plant |
| 33 | 4000597-OS-48002 02/06/04 | HPCL | Rate contract for seal welding of CS,SS |
| 34 | 4000080-OP-48002 19/04/04 | HPCL | Emergency Replacement of CC3 H |
| 35 | 7001144-OS-48002 23/11/07 | HPCL | Mechanical Repairs in Reactor |
| 36 | 7000071-OS-48002 19/04/07 | HPCL | Rate contract for Annual Shutdown |