| 1 | 02 - 04426 dated 13.05.2002 | HPCL | Cleaning & Repair Jobs of Debutanizer Tower 14T5 (LPT802) in Cr - LPG Unit |
| 2 | P.O. 01 - 00138 STDSM | HPCL | Opening & Cleaning of the drums VP-D-2 and VP-D-3 and Hydro testing of HP and MP Steam circuits |
| 3 | MES/251/L/2K/272-A | RCF | Hydro test of Vessel in Ammonia V Plant |
| 4 | MES/251/L/2K/272-A | RCF | Hydro test of Vessel in Ammonia V Plant |
| 5 | MES/251/L/2K/273-B | RCF | Hydro testing of vessel in Ammonia V Plant |
| 6 | | HPCL | Opening cleaning & Misc. jobs for BC-D-1001 in FRE-MAY'99 Shutdown |
| 7 | MES/203/L/99/268 | RCFL | Hydro testing of vessels. |
| 8 | EC : 274.1/106/2000/L | BPCL | Carry out jobs on CDU NB2A B1, B2 Heater CMU F01, F02 Heater during CDU Complexes shutdown in April 2000 |
| 9 | 4000200 - OS - 48002 dated 29.04.2004 | HPCL | Shutdown , May 2004 Opening , Cleaning |
| 10 | 3011396 - OP - 48002 dated 01.04.2004 | | Replacement of Drums D 204 and D4 |
| 11 | MES/251/L/0405/350 dated 22.11.2004 | RCFL | Hydro Testing of Pressure Vessels in 04-06 Section in Amm. V Plant. |
| 12 | MES/251/L/0405/351 dated 3.12.2004 | RCFL | Hydro Testing and Demister Inspection of Pressure Vessels in Amm. V Plant |
| 13 | MES/233/L/0405/377 dated 11.12.2004 | RCFL | Fabrication and Replacement of ML3 tank Roof with Shell Portion in ANP Plant |
| 14 | MES/233/L/0405/433dated 29.01.2005 | RCFL | Hydro Testing of Pressure Vessel in ANP Plant |
| 15 | MES/251/E/0405/622 dated 02.04.2005 | RCFL | Repair of Liner /Bundle/ Control valve during R.G Boiler Gas outlet lint leak repair in Amm. V plant |
| 16 | 4501660859 dt 15.09.20062 | BPCL | Jobs on Vessels - Columns - RV are in FCCU shutdown jobs. |